Quick Links

Upcoming Events

«
»
  • 01
    10/01

    Collection System Rehab

    All day
    10/01-12/29

    Project consists of relining approximately 8,500 feet of 8″ diameter sewer main in Manheim Twp, East Hempfield Twp, and Manor Twp. LASA has contracted with Mr Rehab from Mechanicsburg Pa to perform the work.  Notices will be given prior to any work being performed and any questions can be directed to the Authority.

  • 02
    10/02

    Collection System Rehab

    All day
    10/02-12/30

    Project consists of relining approximately 8,500 feet of 8″ diameter sewer main in Manheim Twp, East Hempfield Twp, and Manor Twp. LASA has contracted with Mr Rehab from Mechanicsburg Pa to perform the work.  Notices will be given prior to any work being performed and any questions can be directed to the Authority.

  • 03
    10/03

    Collection System Rehab

    All day
    10/03-12/31

    Project consists of relining approximately 8,500 feet of 8″ diameter sewer main in Manheim Twp, East Hempfield Twp, and Manor Twp. LASA has contracted with Mr Rehab from Mechanicsburg Pa to perform the work.  Notices will be given prior to any work being performed and any questions can be directed to the Authority.

  • 04
    10/04

    Collection System Rehab

    All day
    10/04-01/01

    Project consists of relining approximately 8,500 feet of 8″ diameter sewer main in Manheim Twp, East Hempfield Twp, and Manor Twp. LASA has contracted with Mr Rehab from Mechanicsburg Pa to perform the work.  Notices will be given prior to any work being performed and any questions can be directed to the Authority.

  • 07
    10/07

    Collection System Rehab

    All day
    10/07-01/04

    Project consists of relining approximately 8,500 feet of 8″ diameter sewer main in Manheim Twp, East Hempfield Twp, and Manor Twp. LASA has contracted with Mr Rehab from Mechanicsburg Pa to perform the work.  Notices will be given prior to any work being performed and any questions can be directed to the Authority.

Sewer Cleaning

LASA uses 2 combination vacuum jetter trucks manufactured by Vactor to clean the sewer lines as well as clear blockages. These trucks utilize high pressure water jet nozzles that travel through the sewer mains. These jet nozzles clean the walls of the sewer pipe and wash any debris to the nearest downstream manhole. These trucks also utilize a large vacuum system that is able to remove debris quickly and efficiently. These trucks carry everything that is needed to perform these tasks. These trucks can also deploy a cutter head to cut roots and cut obstructions such as protruding laterals. This is work is done to prevent future blockages, maintain sewer capacity in the pipeline and prevent debris from entering the pumping stations. Approximately 350,000 feet of pipeline is cleaned every year by LASA staff. Check the calendar for scheduled cleaning activities.