Sewer System Improvements
Upper Little Conestoga River Interceptor Rehabilitation Phase 5 -Project Design
This is the fifth phase of the 5 year interceptor rehabilitation project, which will rehabilitate approximately 5,000 feet of sewer main.
Lower Little Conestoga Interceptor Rehabilitation Phase 4 -Restoration Phase
This is the fourth phase of the 5- year interceptor rehabilitation project, which will rehabilitate 4,118 feet of interceptor and 17 manholes. Cost estimate $3,000,000
The project has been awarded to Spiniello Companies.
Project completed with restoration to be completed spring of 2024
Silver Spring Pump Station Upgrade Design
This is a contract to design, bid, and manage construction of replacing LASA’s Silver Spring pump station, as recommended in the collection master plan. The design and construction management contract is with ARRO Consulting.
Total cost of this project is $169,681.00
Landisville 1 Pump Station Upgrade Design
This contract is for design and construction administration of the upgrade and expansion of LASA’s Landisville 1 pump station, as recommended in the LASA collection system master plan. The contract is with ARRO Consulting.
Total cost of this project is $303,894.00
Trucked Waste Improvements Design
This is the permitting, planning, design, bidding and construction administration for the Authority’s trucked waste improvements project at the LASA treatment plant. The design contract is with Hazen & Sawyer.
This construction project would include construction of a trucked waste administration building and 2 holding tanks, each with submersible chopper pumps, screening equipment, new force main discharge piping, new electric, potable and utility water to serve the new station, and construction of an enclosure for the receiving area.
Total cost of this project is $226,425.00
LASA Treatment Plant Upgrade
The LASA treatment facility is undergoing a major upgrade that will include rehabilitation, replacement, and new construction of improvements to the liquid process, including a five stage BNR process that requires retrofitting existing process tanks and construction of 2 new trains, 4 new blowers and aeration piping, a supplemental carbon feed system and a nutrient side stream treatment system; a new secondary clarifier and new RAS/WAS pump station, WAS rotary drum thickening including WAS equalization storage and mixing, and new effluent flow metering. The design contract is with Hazen & Sawyer.
The design contract is for $5,248,284. The current estimate for construction is $70 Million.
Mountville Interceptor Stream Bank Stabilization
LASA will be working to stabilize the stream bank behind 3710 Columbia Ave in Manor Twp. to prevent further erosion around the sewer main.