Calendar
- 0911/09
Dye Testing- Columbia Borough
https://lasa.org/event/dye-testing-columbia-borough/All day11/09-01/22Crews will be dye testing rain gutters, downspouts, area drains, etc. to determine if they are connected to the sanitary sewer system.
Phase #4 Little Lower Conestoga River Interceptor Relining Project
https://lasa.org/event/phase-4-little-lower-conestoga-river-interceptor-relining-project/All day11/09-07/09Project consists of the relining of approximately 4,700 feet of 48″ diameter sewer main. The project will begin just south of Columbia Ave at Stone Mill rd, heading north to Marietta Ave. LASA has contracted Spiniello Companies to perform the work. Along with the relining of the sewer mains, manhole rehabilitation will also be performed.
- 1011/10
Dye Testing- Columbia Borough
https://lasa.org/event/dye-testing-columbia-borough/All day11/10-01/23Crews will be dye testing rain gutters, downspouts, area drains, etc. to determine if they are connected to the sanitary sewer system.
- 1111/11No events
- 1211/12No events